Build notes

What was decided, and what it cost.

Each product carries the reasoning behind it — the constraint, the decision, the trade-off, and the parts that went badly. Written when there is something worth reporting, not on a schedule.

GearDockGH

2026

Every listing had to answer one question before anything else: is this in Bolgatanga today, or is it not?

The first decision was to hold stock. It is the expensive one. Dropshipping would have let the storefront launch with a hundred listings and no capital, but the failure mode is that a customer in Bolgatanga pays and then waits on someone I do not control. That is the exact experience the shop exists to replace, so the catalogue is small and most of it is in a room I can walk to.

↗Read the GearDockGH note

ImportBrain

2026

If the number on the screen is not the number that was actually paid, the software is worse than the exercise book.

ImportBrain started as the spreadsheet I kept for GearDockGH. It worked until a single batch arrived in two shipments with three separate clearing charges, and I could no longer say what one power bank had cost me. The first version of the software did exactly one thing: divide a batch into per-unit cost correctly.

↗Read the ImportBrain note

More will appear here as things ship and break. Nothing is published to fill space.